  • Green #14
  • Green Inspection2
  • FilterInspection1
  • New pond A
  • New cart path
  • New cart path causeway
  • New cart path causeway
  • Looking north green 13
  • Hole 14 looking south
  • Hole 13 green
  • New pond B
  • Hole 12 bunker on left_green on right
  • Hole 12 green in foreground
  • Hole 12 view west from tee boxes
  • Hole 13 green seeding in progress
  • Hole 13 mid fairway
  • Hole 13 mid fairway
  • Hole 13 tee view north
  • New south pond center
  • New south pond
  • New south pond
  • New south pond
  • Newly placed hydroseed near hole 14 green(1)
  • Newly placed hydroseed near hole 14 green(2)
  • South Pond A view east
  • View south from hole 14 tee box
  • Automatic pond liner seaming
  • Liner Pond B with pipe
  • Liner placement from roll
  • View northeasterly from hole 13 fairway
  • Backfilling behind pond B retaining wall
  • Retaining wall construction at ponds A and B
  • Old sewer pipes 36 inch dia replaced because of leaky joints
  • From hole 13 tees view north of fairway
  • Foreground hole 13 green, background ponds A and B
  • Hydroseed application at hole 13 tees(2)
  • Hydroseed application at hole 13 tees
  • Hole 13 fairway bunker_sod filter sand to be added
  • Hole 12 tee view westerly of fairway
  • Hole 12 tee boxes, cart path paving pending
  • From hole 13 tees view south of hole 12 green