News Flash Home
The original item was published from 3/12/2015 10:37:00 AM to 3/16/2015 9:39:59 AM.

News Flash

Everett TV Special Programming

Posted on: March 12, 2015

[ARCHIVED] Broadway Bridge Replacement Timelapse

Structure and roadway excavation continues and the steel substructure is removed on the south side of the bridge.
Drilled shaft construction for retaining walls and bridge pier 4 on the north side is underway.

The Broadway Bridge spans over the main line of the Burlington Northern Santa Fe railroad on Broadway between Hewitt Avenue and California Street in Everett, WA. The bridge replacement project contract was awarded to Interwest Construction in October 2014. The new bridge is expected to open to travel by early 2016. The total project cost, including design and construction, is $13.6 million.

Drivers can follow construction progress and check conditions on detour routes with new traffic cameras available on the project website. For camera links, project details and detour maps, visit http://www.everettwa.org/Broadway

Facebook Twitter Email