News Flash

City of Everett News

Posted on: November 20, 2018

Work to begin on South Evergreen Way water main replacement project

watermainq

EVERETT, WA – Work is scheduled to begin Monday, Nov. 26, to install a water main in the northbound lanes of South Evergreen Way, from Holly Drive to East Casino Road. Signs will be posted advising motorists of traffic revisions.


A city contractor will replace 2,500 feet of pipe that was installed in the 1930s and is susceptible to breaks. The new pipe will improve water flow and reduce the risk of breaks.


Due to traffic volume on Evergreen Way, work will occur in the evening, beginning at 10 p.m. or midnight. During construction, the two outside northbound lanes adjacent to the worksite will be closed and traffic will be routed to the inner lane.


Work is expected to be complete by mid-February. For more information, visit www.everettwa.gov/WaterMainQ.


###

Download news release (PDF)
Facebook Twitter Email

Other News in City of Everett News

Fare Card Change

New year, new fares for Everett Transit

Posted on: December 28, 2018
transitbus

Get ready for new fares, routes in 2019

Posted on: December 4, 2018
Busbulb

Better bus stops headed to N Broadway

Posted on: November 14, 2018

Stay connected!

Posted on: April 18, 2011

Website Personalization Now Available!

Posted on: October 28, 2011