City water maintenance crews are taking a 12-inch water main out of service along 35th Street, between Oakes and Wetmore. This work is in preparation for the installation of a storm drainage pipe to address recurring flooding of the 3500 block of Wetmore Avenue during storm events. Installation of the drainage pipe is scheduled to begin September 10, but is dependent on the resolution of the Operating Engineers Local 302 strike. More information is available on the Wetmore Ave Stormwater Bypass project webpage.
We encourage you to share this information with your neighbors. For information about your neighborhood group, including meeting times, visit everettwa.gov/neighborhoods.