- Home
- Your City
- Departments
- Public Works
- Surface & Stormwater
- Surface Water Comprehensive Plan (SWCP)
Surface Water Comprehensive Plan (SWCP)
The City of Everett Surface Water Comprehensive Plan consists of four volumes, including a Summary and Implementation Plan along with 3 watershed volumes. The Lake Washington, Port Gardner Bay, and Snohomish River Watershed volumes have individual basin plans for areas that drain to streams and lakes.
Basin plans consist of a basin characterization, issue identification and ranking, and conceptual solutions for issues. The Summary and Implementation plan includes a summary of the program and regulatory history, recommendations, and 4 different project lists: Capital Improvement Projects, Non-Capital Improvement Projects, Opportunity Projects, and Private Issues.
SWCP Volumes 1 through 4:
- SWCP Vol 2 Lake Washington Watershed Plan
- SWCP Vol 3 Port Gardner Bay Watershed Plan (Due to file size this may take longer to open.)
- Pigeon Creek No 1 Basin Plan
- Pigeon Creek No 2 Basin Plan
- Glenhaven Creek Basin Plan
- Glenwood Creek Basin Plan
- Phillips Creek Basin Plan
- Merrill & Ring Creek Basin Plan
- Narbeck Creek Basin Plan
- Powder Mill Gulch Basin Plan
- Edgewater Creek Basin Plan
- Japanese Gulch Basin Plan
- Bay Bluffs Basin Plan
- Waterfront Basin Plan
- SWCP Vol 4 Snohomish River Watershed Plan
- SWCP Vol 1 Summary & Implementation Plan (PDF)
- SWCP Vol 2 Lake Washington Watershed Plan (PDF)
- SWCP Vol 3 Port Gardner Bay Watershed Plan (PDF)
- Pigeon Creek No 1 Basin Plan (PDF)
- Pigeon Creek No 2 Basin Plan (PDF)
- Glenhaven Creek Basin Plan (PDF)
- Glenwood Creek Basin Plan (PDF)
- Phillips Creek Basin Plan (PDF)
- Merrill & Ring Creek Basin Plan (PDF)
- Narbeck Creek Basin Plan (PDF)
- Powder Mill Gulch Basin Plan (PDF)
- Edgewater Creek Basin Plan (PDF)
- Japanese Gulch Basin Plan (PDF)
- Bay Bluffs Basin Plan (PDF)
- SWCP Vol 4 Snohomish River Watershed Plan (PDF)
-
Heather Griffin, P.E.
Surface Water ManagerPhone: 425-257-7206