This project will replace an aging sewer line and construct a new lift station near Beverly Lake. The replacement will improve the performance of the sewer system and protect public health, private property and water quality in Beverly Lake.
Construction on a replacement sewer line near Beverly Lake, along 75th Street, will begin in summer of 2024. This project will replace a section of aging sewer line. During maintenance work in 2012, it was determined the aging system should be replaced, and the City began the process of evaluating, designing and funding the planned replacement project. A temporary fix was completed in 2012 to repair a break, but a permanent fix is required.