The project replaces aging and undersized cast iron and ductile iron water mains with new ductile iron or High Density Polyethylene (HDPE) water mains. Most of the water mains to be replaced were constructed in the 1940s to early 1950s. The new water mains will provide reliable water service to customers, lower maintenance costs and provide more capacity for fighting fires.
Services will be replaced to the meter/within the right of way. Restoration will be pavement patch or concrete panel replacement, and replacement of sidewalks and curbs where removed for installation of the water main and services.
The design is for water main replacements in several locations; construction phasing of these locations is to be determined.